Cart path sinking around disconnected culvert |
Space can be seen here where the connection should be tight |
Repaired culvert |
Stone was compacted all around the pipe for stability |
New "bridge" was framed and leveled with sand |
Wire mesh installed for strength and concrete being poured |
Concrete finished and rebar set for block installation |
Block being installed on both sides |
Stone veneer was custom fit piece by piece |
Thin veneer being applied to the sides |
Cap pieces added as the final touch |
New path poured to align properly to the new bridge |