Construction has started on 1 North and we've made great progress already. The fairway bunkers are already roughed in on the right side and the 2 front greenside bunkers have been removed and it was graded for the new bentrgass area.  The new front left greenside bunker has also been roughed in and area for the new left fairway bunker has been stripped and is awaiting the dozer.  Drain lines are currently being installed and bent sod is being laid on the new roll-off area on the front right of the green.  All this has been accomplished after ground breaking Tuesday at 2:15pm.  Enjoy the pictures below of parts of the process so far and stay tuned for more soon.

Old sand and sod removed

All old sand and turf removed from the old bunkers

Rough shaping new bunkers and hand picking rocks/debris 

Hauling new soil in to fill old bunker cavities and prepare for shaping on the right side of #1 North green

Shaping new right side fairway bunker 30 yards from the green on 1 North. Brian Huntley close by during shaping for accuracy 

Bentgrass sod being installed on the new roll-off area in front of 1 North green.