Preparing the bunker for heavy traffic during asphalt hauling |
The loader gets asphalt in small amounts from the main truck |
Asphalt is then loaded into hauling vehicles for transport to the bunker |
Hard working staff rakes and shovels the asphalt into place and checks often for a depth of 2.5" |
The finished product offers a unique look to your bunker before sand installation |
The new right-side fairway bunker on 1 North with the new approach in the background |
New green side bunker on 7 South ready for sand |