The range tee expansion is moving along well. The tee has been leveled and our staff is currently installing new irrigation. We expect to have the tee top surface seeded early next week with the sides sodded as well. With good weather we hope to have the tee expansion ready for use in mid to late June.
Following the South course renovations being completed we will be concentrating on sodding areas of the course where garden beds used to be but were removed according to our golf course enhancement plan. In addition to this we will be adding drainage in 9 North fairway to improve this poorly draining area.
5 South Fairways being connected with bentgrass sod |
Matrix bunker liner installed on 2 South fairway bunker |
Matrix bunker liner installed on 1 South fairway bunker |
Green expansion on 3 South growing strong! |
Sand installation on 3 South |
5 South taking shape with new bluegrass sod laid |
"Native" fine fescue sod laid where old 9 South tees used to be |
Irrigation Tech John Goss (left) and Josh Decatur (right) doing a great job maintaining our system during renovations |